How We Assemble a Wemano Screw Air Compressor — Behind the Scenes

Have you ever wondered how a screw air compressor is built? In this article, we take you inside the Wemano factory. You will see how each air compressor is assembled, tested, and prepared for delivery.

7/3/20251 min read

Wemano Logo
Wemano Logo

Step-by-Step Assembly Process

We start from the frame and work our way through every component. From rotor and airend installation to oil circuit and electric wiring, every step is managed by trained technicians.

Once the parts are assembled, the machine goes through pressure testing and noise checks. We make sure each unit runs smoothly before shipping.

Quality Control You Can See

At Wemano, quality comes first. We follow strict inspection steps at every stage. That includes component checks, torque settings, and leak detection.

Each compressor is tested under real working pressure. Only after passing all tests do we approve the machine for packaging.

Built for Global Needs

Our compressors are used in many industries. That includes food and pharma, electronics, general manufacturing, and more.

We offer oil-free options, energy-saving VSD models, and customized units. No matter your location or working condition, we can provide a reliable solution.

Watch the Full Video

Want to see how it’s done? Watch our factory process video and explore our production flow in detail.

You will see our team in action, from start to finish.

Get in Touch

Looking for a trusted air compressor supplier? Or want to become a Wemano distributor? Contact us today.